Please click here for the latest Hemlock Creek Construction Project update (7/17/19)

 

*** Hemlock Creek Watershed Utility Improvement Project ***

BRIEF PROJECT UPDATE REGARDING COMPLETED ITEMS

As of the week of February 11, 2019, the following items have been completed on the Project:

HILLSIDE ROAD: Sanitary sewer mainline and laterals installed from H.N.’s 2461 to 1549; Work suspended; anticipated for completion in April 2019
OAK LANE: Sanitary sewer mainline, laterals, and new water main installed; Water main needs connecting to Hillside Road; Storm sewers to be performed
SHADY LANE: Sanitary sewer mainline, laterals and new water main installed; Storm sewer point repairs complete and water main completed. 
SEVEN HILLS BLVD.: Sanitary sewer mainline and laterals installed from Starlight Drive to Cherry Lane.
TWILIGHT DRIVE: Sanitary sewer mainline and laterals installed; Storm sewer point repairs completed; Culvert pipe repairs in progress.
MARY LANE: Sanitary sewer mainline installed
NORTH MARY LANE: Sanitary sewer mainline installed
SOUTH MARY LANE: Sanitary mainline in progress
NEMET DRIVE: Sanitary sewer mainline installation and storm sewer point repairs are in progress
CHERRY LANE: Work has not started as of this update

Feel free to check back for additional Project updates.

 

Thank you for your continued patience throughout the construction process.


The Construction Schedule for the Hemlock Creek Watershed Utility Improvement Project can be found here.
Please note that the Construction Schedule is considered tentative and can change as construction progresses.

 
JUNE 2018 Update:

-       Construction for The Hemlock Creek Watershed Utility Improvements Project has been awarded to Fabrizi Trucking & Paving Co., Inc. with the lowest and best bid of $6,666,452.71.

-       Actual construction is nearly underway with tree removal and tree trimming operations commencing the week of June 4, 2018.  Construction notices are being hand-delivered by the Contractor to the affected residents where tree removals will be performed.

-       As construction progresses, all affected residents will be notified by a hand-delivered construction notice.  Look for these notices to be delivered around 4 days before the construction will begin on your street.

-       As always, the City appreciates your patience during the construction of the Hemlock Creek Watershed Utility Improvements Project.  If there are any concerns you have, please contact Daniel J. Collins, P.E., City Engineer at dcollins@rlba.com or, Councilman Thomas Snitzky at snitzky7hills@ymail.com .

At least 4 to 5 days before construction begins on your street, the Contractor will be hand-delivering a Notice to each home that provides important information about the Project including the Contractor contact names and a phone number. Click here to see an example letter. Please do not be alarmed by this Notice as it is intended to provide you with helpful information.

 
Attention Affected Hemlock Creek Watershed Utility Improvement Project Residents(residents on Hillside Road, Seven Hills Boulevard, Cherry Lane, Nemet Drive, Twilight Drive, South Mary Lane, Mary Lane, North Mary Lane, Oak Lane, and Shady Lane)

  • By now, all residents and/or property owners within the Project location should have received the January 3, 2018 “Notice to Property Owners of Special Assessments” letter.  This letter provides the preliminary cost of the assessment that each affected resident will be paying.

 

  • If you have any questions regarding the January 3, 2018 “Notice to Property Owners of Special Assessments” letter that was U.S. Certified Mailed and/or hand-delivered to your property, or have NOT received your letter, please contact the Engineering Department as soon as possible at (216) 525-6258 so that you can obtain this important letter that is required by law for you to have.